734.212.3006
 
 
     

W5000 Series - Route and Return Silicone Joint System

CEI Composite Materials’ W5000 Route & Return Silicone Joint Panel Systems offer an economical assembly utilzing a foam backer rod and caulk joint. The non-progressive design offers versatility, hidden fasteners and custom blended joint colors.

Request digital drawing files

System Advantages

  • Lightweight, All Aluminum Construction
  • Able to be Used with Complex Curves & Shapes
  • Insulated and Non-Insulated Design Options
  • Available Joint Width of ½” 
  • Versatile Design and Easily Installed
  • Able to be Applied Over Various Substrate Materials
  • Weather Tight Seal

W5000 Series Projects

20.jpg
Westchester Community College - Gateway Center Building Green
An Educational Facility utilizing the W5000 Series - Route and Return Silicone Joint System.
17.jpg
Hamot Women's Hospital
CEI was required to utilize a rapid delivery format in order to design, fabricate and install the ACM panels immediately after framing was completed. This three phased Hospital Project finished with a canopy of radius MCM Soffit Panels.
11.jpg
Aloft Hotel
The Aloft Hotel located at BWI Airport consisted of custom color accent bands, MCM wall panels and colum covers.
12.jpg
Audi of Wynnwood
The Audi of Wynnwood was a retrofit dealership consisting of MCM Metal Wall Panels.
9.jpg
Mt. Laurel Marriot
This hotel project was designed to retrofit an existing building. Sunshades, airfoils and column covers were implemented in order to update the aesthetics of the building’s facades.
8.jpg
Hamot Neurological Center - Phase II
The second phase of the Hamot Medical Group project was completed by CEI during the winter months in order to close out the building’s envelope.
4.jpg
Lexus of Orange Park
CEI designed and fabricated highly visible panels for this Lexus dealership’s front canopy and main entrance.

 

“We would like to take this opportunity to express our appreciation of the job your firm did on the Chapman BMW project.  CEI Composite Materials took over the ACM scope of work at mid-stream and completed it with minimum disruption to our schedule.  This occurred at a critical point in the project.  Your extra effort with the smooth transition is greatly appreciated.  We have recieved several compliments on the ACM Panels.  It is a striking design and installation.  Thanks for being part of our successful project and we look forward to working with you and CEI Composite Materials in the future.”       

Tom Souter, 
Johnson Carlier, Inc. (Chapman BMW)

Bookmark and Share